BACKGROUND
A leading manufacturer of structural wind towers wanted a high production blast room for surface treatment of wind tower sections.
Strong growth in the wind industry meant that demand outstripped their production. Coupled with labor shortages, the blasting process soon became the production bottleneck.
Robotics seemed the obvious solution. However, we couldn’t disrupt production to install a new booth that could fit the robots.
SOLUTION
BlastOne worked with the customer to carefully plan and design extensions to the existing blast room and integrate blasting robots into the existing facility.
Booth extension to existing booth to accommodate robotics and larger wind tower sections
RESULTS
In conclusion, blasting is now no longer the bottleneck for the plant. The blasting process consistently results in an even finish and record-breaking cycle times for each wind tower section produced.
Robot design rendering
Extension to booth complete
Extension to booth complete
Robotic installation in booth
KNOWLEDGE & LEARNING
5 CRITICAL COMPONENTS OF A BLAST ROOM
4 WAYS TO CURE PAINT FASTER
THE PROPER EQUIPMENT FOR EACH COATING
CASE STUDIES
Contact BlastOne
We love to talk to customers and help them make the best decisions when purchasing equipment.
You can reach us via our Live Chat, Email, Phone, and Online Form.